After 20+ Years Without a Driveway, Built in 5 Days
This Ormeau family went more than 20 years without a proper driveway. Cars drove in over a dirt and gravel track through the front fence, and over time the ground started to wash away. When erosion became a real problem, they called us. We built a new exposed aggregate driveway that runs from the street up to the house and the double garage, finished in 5 days.


The Problem: Two Decades of Dirt Track and Erosion
Without a driveway, every car trip wore the track down a little more. On a sloping block, rain carried loose soil and gravel down toward the street, leaving ruts, bare patches and a muddy entry after every storm. It looked untidy from the road, and the erosion was only going to get worse.


Five Days, Start to Finish
Site Preparation and Layout
We excavated the track and levelled the base, then set out the driveway in a Y shape: one arm to the front of the house, the other straight up to the double garage. Formwork set the shape and falls so water runs off the slab in a controlled way instead of carving up the ground.
Pouring the Exposed Aggregate
The driveway was poured and finished as exposed aggregate. Once the concrete starts to set, the top layer of cement paste is washed off to reveal the stones underneath. That gives a textured, non-slip surface that suits a sloping driveway and hides dirt and tyre marks well.
The Result
The new driveway gives the family a clean, solid entry for the first time in over 20 years. The Y layout serves both the house and the garage, the textured finish gives good grip on the slope, and the exposed soil is no longer washing away into the street. The natural stone tones also sit well with the brick, red roof and green picket fence.
Why Exposed Aggregate for a Sloping Block?
Grip
The stone surface is naturally non-slip, which matters on a slope and in wet weather.
Low maintenance
The texture hides dirt, leaves and tyre marks.
Durable
A well-built slab stands up to daily traffic and Gold Coast weather.
Looks good
A natural stone finish that suits most homes.
Learn more about our exposed aggregate driveways or read how we pour an exposed aggregate driveway.
New Driveway FAQs
How long does a new exposed aggregate driveway take?
This Ormeau driveway took 5 days from start to finish. Timing depends on size, access, site preparation and weather.
Can a driveway help with erosion?
Yes. A properly formed slab covers the exposed soil and directs water off the surface, so rain stops washing the ground away under car tracks.
Do you service Ormeau and the northern Gold Coast?
Yes. We work throughout the Gold Coast, including Ormeau, Pimpama, Coomera and Upper Coomera, and across Greater Brisbane.
Get a Free New Driveway Quote
Still putting up with a dirt track or a worn-out driveway? Call Chad on 0473 146 366 or request a quote online.